Big Qualicum River

jan-feb-2005-040

Picture 1 of 5

Big Quailicum River

UPPER BIG QUALIUM RIVER

Time: Distance: Level of Difficulty:
2 ½ Hours 12 Km Easy to Moderate

 

A wide, level, well-graded road running beside an unspoiled natural river makes this one of the best walking routes in the Oceanside area.  Habitat preservation and salmon enhancement have preserved the Big Qualicum River and resulted in a well-maintained road with no vehicular traffic.  Easy access from both ends of the trail allow one to break this route into two pleasant walks of approximately 2 to2 ½ hours each.  Alternatively, the entire trail could be hiked in a little over 4 hours if the interesting detours were eliminated and transportation was arranged at both ends.

 

Directions:  From the intersection of Horne Lake Road and Highway 19, head southwest 4.5 Km to the information sign at the intersection with Horne Lake Caves Road.  Turn right and drive for 2 Km to the bridge over the Big Qualicum River.  Shortly after crossing the bridge, turn right on Fish Hatchery Road.  Turn right 0.5 Km later and park at the yellow gate.

Proceed past the gate and head downhill for 5 minutes.  Turn right and walk upriver to the Gauging Weir and Valve House.  Return back to the main road and continue downriver for 10 minutes.  Turn right and head upriver to the Incubation Site.  Return to the main road and continue downriver for approximately 45 minutes.  Midway between the Incubation Unit and the Main Hatchery is a fenced in spawning channel controlled by a small weir.  This convenient landmark is used to divide the upper and lower sections of this walk.  Return back upriver to the starting point.  Total time for this 12 km return walk, including detours to the Incubation Site and Valve House is approximately 2 ½ hours.

LOWER BIG QUALICUM RIVER 

Time: Distance: Level of Difficulty:
2 Hours 9.0 Km Easy to Moderate

A wide, level, well-graded road running beside an unspoiled natural river makes this one of the best walking routes in the Oceanside area.  Habitat preservation and salmon enhancement have preserved the Big Qualicum River and resulted in a well-maintained road with no vehicular traffic.  Easy access from both ends of the trail allow one to break this route into two pleasant walks of approximately 2 to2 ½ hours each.  Alternatively, the entire trail can be hiked in a little over four hours if the interesting detours are eliminated and transportation is arranged at both ends.

 

 

Directions:  From the intersection of Highway 19A and Fisheries Road in Qualicum Bay, drive southwest and park at the Big Qualicum River Hatchery.

At the entrance to the Fish Hatchery, turn right and follow the road past the office to the bridge over the Big Qualicum River.  Continue straight ahead on to the Private Industrial Road.  Follow the road to the left heading up river towards Horne Lake (11Km), the Valve House (10 Km), the Incubation House (9 Km) and the Spawning Channel (1Km).  After passing under the railway trestle, continue along past the bridge over the channel to the right.  Take the road to the left that goes down to the Chum Spawning Channel and information sign.  Continue along this lower road past two weirs to a T intersection at the third weir.  Turn right, then immediately turn left back onto the Private Industrial Road.  Approximately 25 minutes after starting pass under the Inland Island Highway bridge over the Big Qualicum River.  Continue along the road, under the high voltage power lines at the 2 Km mark.  Approximately 40 minutes after starting, keep an eye open for a trail to the left that leads to a log bridge over the river.  Continue along the road for another 18 minutes to the end of a fenced in spawning channel and the weir that controls the flow of water into it.  Return to the trail that leads to the log bridge and cross the river.  Head downstream on the trail along the river and pass under the highway bridge.  There are a number of small channels you must cross on the east side of the river, but as of February 2005 there were rustic bridges across them all.  Approximately ½ hour after crossing the river, you will arrive back at the upper bridge across the spawning channel.  At present it is considered to be unsafe and posted “Keep Off.”  Continue along the south side of the river to the first weir just up stream from the railway trestle.  Turn left and cross the river and channel on the footbridges over the weir.  Turn right and follow the Private Industrial Road back to the beginning.  Total time for this 9 Km trail is about 2 hours return.

 

 

Share
Close Menu